MEPL JD
CatalogCategoriesBrandsAnalyticsNew

MEPL JD

JD catalog demo by MEPL

Navigation

  • All Products
  • Categories
  • Brands
  • Category Analytics 📊

Tools

  • Advanced Search
  • My Favorites

Admin

  • Dashboard

© 2026 MEPL JD. All rights reserved.

Back to Catalog
Labi Baby Children's Curved Collar Long Sleeve Cotton Thermal Half-Back Shirt 2-Pack Light Khaki 120
Thumbnail 1
Thumbnail 2
Thumbnail 3
Labi Baby•Children's thermal underwear

Labi Baby Children's Curved Collar Long Sleeve Cotton Thermal Half-Back Shirt 2-Pack Light Khaki 120

CNÂ¥85.00
SKU: 100194505319
Status:Out of Stock
ID: 100194505319
Weight: 195.00 g
Dims:257x174x24 mm

Specifications

Customizable or not
Not customizable
Release date
Summer 2025
Suitable Gender
Universal
Category
Autumn clothes
Material
Cotton100%
Thickness
Routine
Security Level
Class A
Fleece-lined
No fleece

Variants / Sale Attributes

Color: (round neck)
Size: 120

Package Contents

1 piece of clothing

Product Description

Product Specifications

Overview

Brand
Labi Baby
Product Name
Yoga Bear Baby Underwear Set (2 pieces)
Design Concept
Cute patterns featuring bears forming letters A, B, C with their bodies; promotes joyful stretching and softness accompanying every moment.
Material
100% Combed Cotton
Color
Light Khaki
Size 73
Age 6-12 months, Height 66-73 cm, Weight 8.5-10 kg, Length 34, Shoulder Width 23, Chest 26

Similar Products

In Stock
Miiow Thermal Vest for Teen Girls with Chest Pads Seamless Fleece-Lined Winter Base Layer Underwear for Middle and High School Students
MiiOWChildren's thermal underwear

Miiow Thermal Vest for Teen Girls with Chest Pads Seamless Fleece-Lined Winter Base Layer Underwear for Middle and High School Students

white + pink

CNÂ¥72.94

View
In Stock
Disney Kids Class A Pure Cotton Autumn Thermal Underwear Set Full Print Boys Student Warm Innerwear Happy Donald Duck 120
DisneyChildren's thermal underwear

Disney Kids Class A Pure Cotton Autumn Thermal Underwear Set Full Print Boys Student Warm Innerwear Happy Donald Duck 120

Happy Donald Duck (Boys)

CNÂ¥59.40

View
Size 80
Age 12-18 months, Height 73-80 cm, Weight 9.5-12 kg, Length 36, Shoulder Width 24, Chest 27
Size 90
Age 18-24 months, Height 80-90 cm, Weight 10-14 kg, Length 38, Shoulder Width 25, Chest 28
Size 100
Age 24-36 months, Height 95-105 cm, Weight 14-17 kg, Length 40.5, Shoulder Width 26.5, Chest 29.5
Size 110
Age 4-5 years, Height 105-115 cm, Weight 15-20 kg, Length 43, Shoulder Width 28, Chest 31
Size 120
Age 5-6 years, Height 115-125 cm, Weight 18-23 kg, Length 45.5, Shoulder Width 29.5
Size 130
Age 7-8 years, Height 125-135 cm, Weight 23-28 kg, Length 48, Shoulder Width 31, Chest 35
Size 140
Age 9-10 years, Height 135-145 cm, Weight 28-35 kg, Length 51, Shoulder Width 32.5, Chest 37
Two-piece set for convenience
one piece can be worn while the other is being washed.

Shoulder opening design for sizes 73-100; round neck design for sizes 100-140.

Water-based printing with adorable patterns.

Elastic binding at back neck to reduce skin friction.

Ribbed cuffs to prevent cold air penetration.

Seamless stitching for smooth and comfortable fit.

Tagless label for irritation-free wear.

Class A First Grade Product

Complies with GB31701-2015 (Safety Technical Code for Infants and Children Textile Products, Class A)

Additional details

Complies with GB/T5296.4-2012 (Consumer Product Instructions Part 4
Textiles and Clothing)

Complies with GB/T29862-2013 (Textile Fiber Content Labeling)

Complies with GB/T39508-2020 (Knitted Infant and Children Clothing, First Grade)

Additional details

Formaldehyde content
Not detected (limit ≤20 mg/kg)
Carcinogenic aromatic amine dyes
Not detected (limit ≤20 ng/g)
Odor
None detected

All test results meet safety requirements; refer to actual product quality inspection report for details.

Wash before first use for child’s health and comfort.

Do not bleach.

Separate dark and light colors to avoid staining.

Hang to dry; do not tumble dry.

Avoid detergents containing bleach or fluorescent agents.

Iron at maximum soleplate temperature of 110°C; steam ironing may cause deformation.

Machine wash in a laundry bag on gentle cycle or hand wash gently.

Do not dry clean.

Avoid vigorous rubbing or wringing.

Size recommendations are for reference only due to individual differences in baby body shapes.

Flat measurements may have a normal error range of 2-3 cm.

In Stock
Hodohome Boys' Autumn Cotton Thermal Underwear Set, Class A, Thin, Warm Long Johns for Older Children, Size 165, Heather Gray, 120
HodohomeChildren's thermal underwear

Hodohome Boys' Autumn Cotton Thermal Underwear Set, Class A, Thin, Warm Long Johns for Older Children, Size 165, Heather Gray, 120

[Regular Style] Boys' Heather Gray Astronaut 165

CNÂ¥52.90

View
Out of Stock
Dingguagua Children's Thermal Pants, Autumn And Winter Girls' Tights, Colorful Cotton Thickened Three-Layer Padded Air Layer Long Johns, Single Pair, Size 110
Children's thermal underwear

Dingguagua Children's Thermal Pants, Autumn And Winter Girls' Tights, Colorful Cotton Thickened Three-Layer Padded Air Layer Long Johns, Single Pair, Size 110

Girls' Single-Piece - Healthy Cotton

CNÂ¥75.60

View