MEPL JD
CatalogCategoriesBrandsAnalyticsNew

MEPL JD

JD catalog demo by MEPL

Navigation

  • All Products
  • Categories
  • Brands
  • Category Analytics 📊

Tools

  • Advanced Search
  • My Favorites

Admin

  • Dashboard

© 2026 MEPL JD. All rights reserved.

Back to Catalog
Demana [Cloud Feel Cotton Blend] Spring Lazy Urban Patchwork Seam Petite Loose Women's Curved Blade Casual Pants
Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Thumbnail 5
dme•women's casual pants

Demana [Cloud Feel Cotton Blend] Spring Lazy Urban Patchwork Seam Petite Loose Women's Curved Blade Casual Pants

CNÂ¥122.00
SKU: 100323392436
Status:In Stock (2)
ID: 100242353441
Weight: 490.00 g
Dims:435x364x17 mm

Specifications

Pants length
Long pants
Suitable Scenarios
Daily, Workplace
Pattern
Solid color
Style
休闲风, Simple style
Release date
Spring 2026
Material
Cotton54%, Polyester (polyester fiber)41.1%, Spandex (polyurethane elastic fiber)4.9%
Zipper fly
Buckle
Trending Elements

Variants / Sale Attributes

color: black
size: M

Package Contents

Category*1

Product Description

Product Specifications

Overview

Brand
dme

Stylish casual pants featuring a design with stitched partition lines, tailored for petite figures. Made from breathable, cloud-like cotton blend fabric that offers a refreshing, delicate, and soft texture, providing a comfortable wearing experience that allows the skin to breathe freely. The pants visually elongate the legs and enhance three-dimensionality with clean and neat cuts. The patchwork design breaks conventional style boundaries, making it suitable for everyday wear.

| Size | Waist | Hip | Length | Leg Opening | Model Size |

|-------|-------|------|--------|-------------|------------|

| S | 66 | 96 | 99 | 47 | 155/64A |

| M | 70 | 100 | 100 | 48 | 160/68A |

| L | 74 | 104 | 101 | 49 | 165/72A |

| XL | 78 | 108 | 102 | 50 | 170/76A |

Additional details

Ivory
54.0% Cotton, 41.1% Polyester, 4.9% Spandex
Black

Similar Products

Out of Stock
PinCai Women's Suit Pants, Professional Wear, High-Waisted, Elastic, Slim-Fit, Slightly Flared, Fashionable, Simple Long Pants P132K2178
PinCaiwomen's casual pants

PinCai Women's Suit Pants, Professional Wear, High-Waisted, Elastic, Slim-Fit, Slightly Flared, Fashionable, Simple Long Pants P132K2178

Black

CNÂ¥100.00

View
In Stock
DME Warm Capture Winter Lightweight Insulation Cold-Proof 90% Duck Down Filling Versatile Women's Flared down Pants, Carbon Black, Size L
dmewomen's casual pants

DME Warm Capture Winter Lightweight Insulation Cold-Proof 90% Duck Down Filling Versatile Women's Flared down Pants, Carbon Black, Size L

Carbon black

CNÂ¥151.00

View
Montage
Elasticity
Micro-elastic
Suitable Ages
25-29 years old, 30-34 years old, 35-39 years old
Customizable or not
Not customizable
54.5% Cotton, 39.8% Polyester, 5.7% Spandex

Cloud-like cotton blend, cool and delicate texture

Soft and gentle, providing a breathable wearing experience

1. Recommend gentle washing to avoid fabric damage; avoid prolonged soaking.

2. Do not mix wash with dark and light colors to prevent color bleeding.

3. If wrinkles appear, iron carefully at a distance of 2-3 cm from the fabric at temperatures below 100°C.

4. Dry in shade after washing; avoid direct sunlight exposure. Store carefully after drying.

5. Due to lighting and display differences, actual product color may slightly vary from images; please refer to the received product.

Additional details

Height
170 cm
Weight
48 kg
Measurements
77/60/87 cm
Wearing Size
M
Fit
Slimming design with elegant curves, providing a comfortable fit that conceals body lines and allows leg movement within the pants.

dme is a fashion brand under Ruipin Fashion Group, founded on principles of fashion, elegance, and simplicity. It caters to confident and poised urban women who pursue stylish lifestyles. The brand creates modern urban images for women, offering fashion and utilitarian apparel that interprets a relaxed yet vibrant life attitude, showcasing unique feminine charm.

In Stock
Langsha Naifu Women's Summer 2026 New High-Waist Slimming Draped Casual Loose Versatile Yamamoto Wide-Leg Pants
women's casual pants

Langsha Naifu Women's Summer 2026 New High-Waist Slimming Draped Casual Loose Versatile Yamamoto Wide-Leg Pants

offwhite (with pockets)

CNÂ¥82.90

View
Out of Stock
Dme Fleece-Lined Warm High-Waist Straight-Leg Lazy Style Soft Glutinous Rice Pants, Petite Casual Pants Wide-Leg Pants, Olive Green XL
dmewomen's casual pants

Dme Fleece-Lined Warm High-Waist Straight-Leg Lazy Style Soft Glutinous Rice Pants, Petite Casual Pants Wide-Leg Pants, Olive Green XL

Olive Green

CNÂ¥94.00

View