MEPL JD
CatalogCategoriesBrandsAnalyticsNew

MEPL JD

JD catalog demo by MEPL

Navigation

  • All Products
  • Categories
  • Brands
  • Category Analytics 📊

Tools

  • Advanced Search
  • My Favorites

Admin

  • Dashboard

© 2026 MEPL JD. All rights reserved.

Back to Catalog
SNDWAY Laser Distance Meter High-Precision Mini Electronic Ruler Infrared Home Measurement Tool for Renovation and Real-Time Distance Measuring
Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Thumbnail 5
SNDWAY•Rangefinder

SNDWAY Laser Distance Meter High-Precision Mini Electronic Ruler Infrared Home Measurement Tool for Renovation and Real-Time Distance Measuring

CNÂ¥135.00
SKU: 100328185102
Status:In Stock (3)
ID: 100328185102
Weight: 140.00 g
Dims:160x90x36 mm

Specifications

How it works
Handheld
Measuring range
40 meters
Category
Infrared rangefinder

Variants / Sale Attributes

Model: 40meter [millimeterlevel accuracy] infrared distance meter

Package Contents

Product *1, Packaging Box *1, Instruction Manual *1

Product Description

Overview

Brand
SNDWAY
Battery Life
Up to 8000 full charge operations
Display
Segment LCD, 25 mm x 52 mm
Dimensions
100.3 × 33.4 × 18.3 mm
Gross Weight
Approx. 138 g
Net Weight
Approx. 67 g
Packaging Volume
Approx. 19 cm (L) x 16 cm (W) x 4.5 cm (H)
Packaging Weight

Similar Products

In Stock
Deli Handheld Laser Distance Meter High-Precision Electronic Ruler Infrared Room Measuring Device 120m Range Millimeter Accuracy
deliRangefinder

Deli Handheld Laser Distance Meter High-Precision Electronic Ruler Infrared Room Measuring Device 120m Range Millimeter Accuracy

Professional rangefinder 120m

CNÂ¥169.00

View
Out of Stock
CEM LDM-50E Laser Distance Meter, Handheld High-Precision Electronic Ruler, Infrared Room Measuring Device with Dual Physical Level, 50 Meters
CEMRangefinder

CEM LDM-50E Laser Distance Meter, Handheld High-Precision Electronic Ruler, Infrared Room Measuring Device with Dual Physical Level, 50 Meters

50-Meter Omnidirectional Level 99 Flagship Model - For You

CNÂ¥58.60

View
In Stock
Deli Wheel Measuring Device, Large Wheels, Hand-Pushed Mechanical Measuring Wheel, Foldable Roller Measuring Device, Circumference 100cm
deliRangefinder

Deli Wheel Measuring Device, Large Wheels, Hand-Pushed Mechanical Measuring Wheel, Foldable Roller Measuring Device, Circumference 100cm

Mechanical Watch Display 100CM Circumference - Foldable

CNÂ¥199.00

View
Approx. 152 g
Compatibility
iOS, Android, Windows

Floor plan measurement (2D and 3D)

Rendering effect visualization

Pythagorean measurement

Obstacle and staircase avoidance

High-precision capacitive touch pen for accurate drawing (2-in-1 pen)

Additional details

SNDWAY handheld laser distance meter (Model
SW-BT40)

Main unit

Velvet pouch

User manual

Data cable

High precision technology measurement method

Additional details

Serial Number
23001162

null

In Stock
Deli Wheel Measuring Device, Double Folding Mechanical Measuring Wheel, Hand-Pushed Roller Ruler, Measuring Tool, 318mm Large Wheel
deliRangefinder

Deli Wheel Measuring Device, Double Folding Mechanical Measuring Wheel, Hand-Pushed Roller Ruler, Measuring Tool, 318mm Large Wheel

Mechanical Watch Display 100CM Circumference - Double Folding Style

CNÂ¥169.00

View