MEPL JD
CatalogCategoriesBrandsAnalyticsNew

MEPL JD

JD catalog demo by MEPL

Navigation

  • All Products
  • Categories
  • Brands
  • Category Analytics 📊

Tools

  • Advanced Search
  • My Favorites

Admin

  • Dashboard

© 2026 MEPL JD. All rights reserved.

Filters

Clear all filters

Filter by Status

All ProductsWith White ImagesMissing White ImagesWith Main ImagesMissing Main ImagesIn StockOut of StockPriced ProductsMissing Price

Sort By

Newest FirstPrice: Low to HighPrice: High to LowName: A-Z

Product Catalog

Showing 24 of 2,798 products

Out of Stock
AMPCOM Cat6 Patch Cable, 3 Meters, Gigabit UTP Unshielded Network Cable for Home And Engineering Wiring, Switch Connection Cable, Black AMC6BK71830
AMPCOMCable

AMPCOM Cat6 Patch Cable, 3 Meters, Gigabit UTP Unshielded Network Cable for Home And Engineering Wiring, Switch Connection Cable, Black AMC6BK71830

[Hot Sale] Cat6 Gigabit, Black

CNÂ¥30.62

View
In Stock
10G Multimode OM3 LC-LC Fiber Patch Cable 2-Core 2m Low Smoke Halogen-Free Flame Retardant Telecom Grade Optical Fiber Drop Cable Transceiver Pigtail 2-21231
WANJEEDCable

10G Multimode OM3 LC-LC Fiber Patch Cable 2-Core 2m Low Smoke Halogen-Free Flame Retardant Telecom Grade Optical Fiber Drop Cable Transceiver Pigtail 2-21231

LCLC Multimode Duplex OM3 Flame Retardant

CNÂ¥34.10

View
In Stock
AMPCOM Telecom-Grade LC-LC Single-Mode Fiber Optic Patch Cable, 9/125 Dual-Core, LSZH Low Smoke Zero Halogen Flame-Retardant Outer Sheath, 2.0 Transceiver, 10G Pigtail for Home Installation, 2 Meters, ASM2LC002
AMPCOMCable

AMPCOM Telecom-Grade LC-LC Single-Mode Fiber Optic Patch Cable, 9/125 Dual-Core, LSZH Low Smoke Zero Halogen Flame-Retardant Outer Sheath, 2.0 Transceiver, 10G Pigtail for Home Installation, 2 Meters, ASM2LC002

LC-LC Single-Mode Dual-Core 9/125 2.0 Outer Diameter

CNÂ¥27.30

View
In Stock
AMPCOM Cat6A Unshielded Ethernet Cable, 25 Meters, 10 Gigabit 8-Core Pure Copper 0.58mm Twisted Pair, Data Center Home Installation LSZH Flame-Retardant Network Cable AM182566
AMPCOMCable

AMPCOM Cat6A Unshielded Ethernet Cable, 25 Meters, 10 Gigabit 8-Core Pure Copper 0.58mm Twisted Pair, Data Center Home Installation LSZH Flame-Retardant Network Cable AM182566

Category 6 10G [Flame Retardant Non-Shielded] Gray

CNÂ¥180.31

View
Out of Stock
AMPCOM CAT6 Gigabit Ethernet Cable, 100 Meters, 8-Core 0.58 Pure Copper Unshielded Twisted Pair, POE Surveillance Home Installation Broadband Network Cable Box AMC657100
AMPCOMCable

AMPCOM CAT6 Gigabit Ethernet Cable, 100 Meters, 8-Core 0.58 Pure Copper Unshielded Twisted Pair, POE Surveillance Home Installation Broadband Network Cable Box AMC657100

Category 6 Gigabit Ethernet Cable, Exceeds Testing Standards, for Engineering Use, Orange

CNÂ¥502.36

View
In Stock
BIAZE CAT6A Pure Copper Ethernet Cable, Super Category 6, 10Gbps, 10m, Compatible with Gigabit, 8-Core, 2.5G Network Patch Cable for Home and Computer Broadband Engineering
BIAZECable

BIAZE CAT6A Pure Copper Ethernet Cable, Super Category 6, 10Gbps, 10m, Compatible with Gigabit, 8-Core, 2.5G Network Patch Cable for Home and Computer Broadband Engineering

Cat 6A 10 Gigabit Upgraded Thickened Pure Copper Version

CNÂ¥44.90

View
In Stock
BIAZE CAT5e Ethernet Cable, Original Oxygen-Free Copper High-Speed Unshielded Cable Supporting POE Power Supply, Home Wiring Project Network Monitoring POE Wiring 200 Meters
BIAZECable

BIAZE CAT5e Ethernet Cable, Original Oxygen-Free Copper High-Speed Unshielded Cable Supporting POE Power Supply, Home Wiring Project Network Monitoring POE Wiring 200 Meters

Cat5e Ethernet Cable [Security And Home Installation] Gray - 200 Meters

CNÂ¥419.00

View
In Stock
BIAZE CAT6 Ethernet Cable [Engineering Version, 0.57±0.008mm Pure Copper Core] Gigabit Unshielded Home Network Monitoring Box Cable, 305 Meters Per Whole Box, 300 Meters
BIAZECable

BIAZE CAT6 Ethernet Cable [Engineering Version, 0.57±0.008mm Pure Copper Core] Gigabit Unshielded Home Network Monitoring Box Cable, 305 Meters Per Whole Box, 300 Meters

National Standard Category 6 Gigabit [Engineering Grade] Blue - 305 Meters

CNÂ¥919.00

View
In Stock
AMPCOM Fiber Optic Patch Cable Telecom Grade Single-mode Single Core 2.0mm SC-SC 9/125μm FTTH Fiber Optic Cable for Optical Transceiver 2 Meters ASM2SC1202
AMPCOMCable

AMPCOM Fiber Optic Patch Cable Telecom Grade Single-mode Single Core 2.0mm SC-SC 9/125μm FTTH Fiber Optic Cable for Optical Transceiver 2 Meters ASM2SC1202

SCSC singlemode singlecore 9/125 2.0mm outer diameter

CNÂ¥9.80

View
In Stock
AMPCOM Telecom Grade LC-LC Singlemode Fiber Patch Cable 9/125 Single Core LSZH Low Smoke Halogen-Free Flame Retardant Jacket 2.0 Transceiver 10G Pigtail 3m ASM1LC003
AMPCOMCable

AMPCOM Telecom Grade LC-LC Singlemode Fiber Patch Cable 9/125 Single Core LSZH Low Smoke Halogen-Free Flame Retardant Jacket 2.0 Transceiver 10G Pigtail 3m ASM1LC003

LCLC singlemode singlecore 9/125 2.0mm outer diameter

CNÂ¥12.80

View
In Stock
BIAZE CAT6A Slim Ethernet Cable, Oxygen-Free Copper, 5 Meters, 10 Gigabit High-Speed Patch Cord, Home Computer Broadband Network Jumper, Black
BIAZECable

BIAZE CAT6A Slim Ethernet Cable, Oxygen-Free Copper, 5 Meters, 10 Gigabit High-Speed Patch Cord, Home Computer Broadband Network Jumper, Black

Cat6a 10Gbps - Thin Ethernet Cable [Oxygen-Free Copper] Black

CNÂ¥13.90

View
Out of Stock
AIENKIS Cat6A Gigabit Ethernet Cable, 10Gbps Patch Cord for Laptops And Home Computers, Broadband Engineering Jumper, Oxygen-Free Copper, White, 3 Meters, AK-B6030
AIENKISCable

AIENKIS Cat6A Gigabit Ethernet Cable, 10Gbps Patch Cord for Laptops And Home Computers, Broadband Engineering Jumper, Oxygen-Free Copper, White, 3 Meters, AK-B6030

Cat6a 10Gbps - White Thin Cable

CNÂ¥19.50

View
In Stock
BIAZE CAT6A Unshielded Network Cable [0.59±0.008mm Pure Copper Core] 10 Gigabit High-Speed POE Power Supply for Surveillance Engineering And Home Wiring Box 100 Meters WX36
BIAZECable

BIAZE CAT6A Unshielded Network Cable [0.59±0.008mm Pure Copper Core] 10 Gigabit High-Speed POE Power Supply for Surveillance Engineering And Home Wiring Box 100 Meters WX36

National Standard Cat6 10G - Engineering Grade - Blue - 100 Meters

CNÂ¥379.00

View
In Stock
BIAZE CAT6 Ethernet Cable, 3 Meters, Gigabit Network High-Speed Connection Cable, Computer Broadband Home Unshielded Flat Patch Cord, Finished Network Cable, Black, Wx9
BIAZECable

BIAZE CAT6 Ethernet Cable, 3 Meters, Gigabit Network High-Speed Connection Cable, Computer Broadband Home Unshielded Flat Patch Cord, Finished Network Cable, Black, Wx9

Category 6 Oxygen-Free Copper Flat Cable - [Home/Engineering] Black

CNÂ¥8.90

View
In Stock
BIAZE CAT7 Pure Copper 2M Ethernet Cable, 10Gbps Shielded Network Cable, Gaming Twisted Pair LAN Cable, Compatible with 2.5G Broadband, Ready-Made Patch Cord
BIAZECable

BIAZE CAT7 Pure Copper 2M Ethernet Cable, 10Gbps Shielded Network Cable, Gaming Twisted Pair LAN Cable, Compatible with 2.5G Broadband, Ready-Made Patch Cord

Category 7 10G [10G Quad Shielded] Engineering Grade

CNÂ¥14.90

View
In Stock
BIAZE CAT5e Ethernet Cable, Original Oxygen-Free Copper High-Speed Unshielded Cable Supporting POE Power Supply, for Home Wiring, Engineering Network Monitoring, POE Wiring, 100 Meters
BIAZECable

BIAZE CAT5e Ethernet Cable, Original Oxygen-Free Copper High-Speed Unshielded Cable Supporting POE Power Supply, for Home Wiring, Engineering Network Monitoring, POE Wiring, 100 Meters

Cat5e Ethernet Cable [Security And Home Installation] Gray - 100 Meters

CNÂ¥229.00

View
In Stock
BIAZE CAT5e Gigabit Ethernet Cable [0.50±0.01mm Pure Copper Core] CAT5e Unshielded Twisted Pair Cable for Home Wiring, POE Surveillance Engineering Wiring, 20 Meters
BIAZECable

BIAZE CAT5e Gigabit Ethernet Cable [0.50±0.01mm Pure Copper Core] CAT5e Unshielded Twisted Pair Cable for Home Wiring, POE Surveillance Engineering Wiring, 20 Meters

National Standard Cat5e [Engineering Wiring] Gray - 20 Meters

CNÂ¥64.00

View
In Stock
AMPCOM Cat6 Gigabit Unshielded Twisted Pair Ethernet Cable, 25 Meters, 8-Core 0.58 Oxygen-Free Copper, POE Surveillance Cable, Network Engineering Box Cable AMC657025(BU)
AMPCOMCable

AMPCOM Cat6 Gigabit Unshielded Twisted Pair Ethernet Cable, 25 Meters, 8-Core 0.58 Oxygen-Free Copper, POE Surveillance Cable, Network Engineering Box Cable AMC657025(BU)

Category 6 Gigabit Pass-Through [For Engineering Use] Blue

CNÂ¥131.86

View
In Stock
BIAZE Cat5e Commercial Grade Dual Shielded Ethernet Cable [0.5 Pure Copper Core] Gigabit Anti-Interference Network Cable for Engineering, Home Installation, Surveillance - 50m
BIAZECable

BIAZE Cat5e Commercial Grade Dual Shielded Ethernet Cable [0.5 Pure Copper Core] Gigabit Anti-Interference Network Cable for Engineering, Home Installation, Surveillance - 50m

National Standard Dual Shielded Cat5e 50 Meters Green

CNÂ¥209.00

View
In Stock
BIAZE Cat6 Ethernet Cable, 0.5 Meter Short Cable, 50 Cm/50CM Gigabit High-Speed Broadband Cable, Cat6 Network Engineering Home Computer Monitoring Patch Cord, Finished Cable
BIAZECable

BIAZE Cat6 Ethernet Cable, 0.5 Meter Short Cable, 50 Cm/50CM Gigabit High-Speed Broadband Cable, Cat6 Network Engineering Home Computer Monitoring Patch Cord, Finished Cable

Category 6 Gigabit Ethernet Cable, Thickened Core, for Home And Construction Projects

CNÂ¥5.90

View
Out of Stock
BIAZE Cat5e Unshielded Ethernet Cable Pure Copper Core Gigabit Network Cable 305m White Full Box for Engineering Home Network Surveillance POE Wiring
BIAZECable

BIAZE Cat5e Unshielded Ethernet Cable Pure Copper Core Gigabit Network Cable 305m White Full Box for Engineering Home Network Surveillance POE Wiring

Cat5e Network Cable [Security Home Installation] White 305 meters

CNÂ¥539.00

View
In Stock
AMPCOM Telecom-Grade 10 Gigabit OM3-300 Fiber Optic Patch Cable, LC-LC Multimode Dual-Core, 50/125 Low Smoke Zero Halogen, Class 2.0 Flame Retardant, 10G/40G Long Fly A-Optic 5 Meters AMO32LC205
AMPCOMCable

AMPCOM Telecom-Grade 10 Gigabit OM3-300 Fiber Optic Patch Cable, LC-LC Multimode Dual-Core, 50/125 Low Smoke Zero Halogen, Class 2.0 Flame Retardant, 10G/40G Long Fly A-Optic 5 Meters AMO32LC205

LC-LC 10 Gigabit OM3 Dual-Core 50/125

CNÂ¥53.90

View
In Stock
12-Core MPO-MPO Fiber Optic Patch Cord Female B Polarity Compatible MTP OM3 Multimode 10G/40G/100G Optical Module Bundle Fiber Cable 3m Q3-PP1203
ZLEUECable

12-Core MPO-MPO Fiber Optic Patch Cord Female B Polarity Compatible MTP OM3 Multimode 10G/40G/100G Optical Module Bundle Fiber Cable 3m Q3-PP1203

MPOMPO Multimode 12Core OM3

CNÂ¥94.00

View
Out of Stock
10,000-Level Fiber Optic Drop Cable Telecom Grade FTTR Fiber to the Home Indoor Butterfly Single-Mode Single-Core 1-Core 2 Steel Wire Optical Cable White 50m 2-19211
WANJEEDCable

10,000-Level Fiber Optic Drop Cable Telecom Grade FTTR Fiber to the Home Indoor Butterfly Single-Mode Single-Core 1-Core 2 Steel Wire Optical Cable White 50m 2-19211

Indoor singlemode singlecore white

CNÂ¥39.80

View
Previous
123...117
Next